Yard Pipe Replacement
Bid results · Maryland · Last reported Sep 2024
Source: Dodge USA
The removal of existing pipe and the installation of new pipe at the Department of Public Works facility, located at 520 Wilmuth Street, Denton, Maryland. 1. Remove and replace pipe infrastructure. Estimated 245ft length. 54 Diameter CIP a. Phase excavation of existing pipe to allow maintenance staff to utilize parking lot. b. Add additional manhole structure towards outlet end. c. Replace surface
- Status
- Closed
- Sector
- Car parking, Power Transmission, Road, Water Supply and Storage, Waste Processing and Treatment, Automotive, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Denton, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Yard Pipe Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The removal of existing pipe and the installation of new pipe at the Department of Public Works facility, located at 520 Wilmuth Street, Denton, Maryland. 1. Remove and replace pipe infrastructure. Estimated 245ft length. 54 Diameter CIP a. Phase excavation of existing pipe to allow maintenance staff to utilize parking lot. b. Add additional manhole structure towards outlet end. c. Replace surface parking lot drain inlet. 2. Remove and haul off spoils. a. No storage of spoils. 3. Backfill exc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Denton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Road, Water Supply and Storage, Waste Processing and Treatment, Automotive, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
