Yarrow Two-Well Development Program
The owner, status and timeline of this project. A free account opens every field.
Source: Petroleum Australia
Red Sky Energy and Santos have agreed to a new two-well development program in the Yarrow gas field within the Innamincka Dome of the Cooper Basin to increase gas production in South Australia. The project involves drilling two new wells, with the first expected to commence imminently, leveraging existing infrastructure for rapid production and cash flow.
- Status
- Prospective
- Sector
- Oil and Gas
- Location
- Yarrow, South Australia, Australia
- Updated
- 19 Nov 2026
- Source
- Petroleum Australia
ConstructChat
Ask ConstructChat about Yarrow Two-Well Development Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Red Sky Energy and Santos have agreed to a new two-well development program in the Yarrow gas field within the Innamincka Dome of the Cooper Basin to increase gas production in South Australia. The project involves drilling two new wells, with the first expected to commence imminently, leveraging existing infrastructure for rapid production and cash flow. |
Original sector | Energy |
Budget |
Location
Country | Australia |
State | South Australia |
City | Yarrow |
Source
Source | Petroleum Australia |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-04-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
