Yazd Solar/CCNG Plant
Sector: Wind • Location: Iran, Islamic Rep.
Source: World Bank Group
MAPNA Group, an Iran industrial group, was planning the development of the 467MW Yadz Power Plant (also reported as 478MW), using both CCNG and CSP technology, in Yadz province. It consisted of two gas turbines of 159MW each, a steam unit of 143MW, and a CSP unit of 17MW. Total capacity used here was 478MW due to the level of detail in the breakdown (more convincing).
The EPC contractor was Pe
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | MAPNA Group, an Iran industrial group, was planning the development of the 467MW Yadz Power Plant (also reported as 478MW), using both CCNG and CSP technology, in Yadz province. It consisted of two gas turbines of 159MW each, a steam unit of 143MW, and a CSP unit of 17MW. Total capacity used here was 478MW due to the level of detail in the breakdown (more convincing). The EPC contractor was Petrotechno (Petro Tech Sun International Co., or: PTS). The equipment was supplied by Alstom and Siemens (CCNG). The CSP system was supplied by Doosan and MAPNA, using Parabolic Through technology. The project was commissioned in 2009. The 'contract' between Iran Electricity Development Organization and MAPNA was signed in fall of 2006. It is not totaly clear if MAPNA is the developer or the EPC contractor - the alternative would be Iran Electricity Development Organization. However, given that Petrotechno reportedly executed the EPC work, it seems more likely MAPNA was the developer and got permitted/awarded by Iran Electricity Development Organization. Assuming construction lasted 3 years (2006-2009), financial closure was reached in fall of 2007. Total cost was reported at EUR 125.7 million ($158.2 million), of which EUR100.55 ($126.6 million) was provided through debt and the remainder in equity ($57.7 million). The debt/equity ratio was 64/36. http://www.petrotechco.com/ http://www.mapnaec.com/website/index.aspx http://www.mehrnews.com/en/newsdetail.aspx?NewsID=469742 http://news.tavanir.org.ir/press/press_detail.php?id=14714 http://news.tavanir.org.ir/press/press_detail.php?id=14714 http://payvand.com/news/07/apr/1132.html |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |