logo
ProjectClosed

Yazoo City Relief Well N91 Replacement

One of 10,000+ projects Taiyo tracks in Mississippi.

Source: Dodge USA

The work for the Yazoo City Well Replacement Project consists of furnishing all plant, labor, materials, equipment, and incidentals required to complete Relief Well Replacement; install a new well in place of an existing well; and abandon/grout existing well in place. Principal features of the work include mobilization and demobilization; abandoning well and installation of a new 14 diameter well;

Status
Closed
Sector
Power Generation (CCGT), Water Supply and Storage, Waste Processing and Treatment, Commercial
Location
Yazoo City, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Yazoo City Relief Well N91 Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Yazoo City Relief Well N91 Replacement” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Yazoo City, Mississippi, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work for the Yazoo City Well Replacement Project consists of furnishing all plant, labor, materials, equipment, and incidentals required to complete Relief Well Replacement; install a new well in place of an existing well; and abandon/grout existing well in place. Principal features of the work include mobilization and demobilization; abandoning well and installation of a new 14 diameter well; new pump and motor for new well; and new underground electrical for new and existing well.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Yazoo City

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Waste Processing and Treatment, Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project