Yell HVAC Connection Project
Sector: Wind • Location: Yell, Scotland, United Kingdom
Source: Shetland News
A proposed High Voltage Alternating Current (HVAC) connection to link the island of Yell to the expanded electricity transmission system on mainland Shetland. The project includes a new substation in Yell to connect the Energy Isles and Beaw Field wind farms, and a subsea cable to the Shetland mainland. Construction is estimated to begin after 2028.
- Status
- Prospective
- Sector
- Wind, Power Transmission, Power Generation (CCGT)
- Location
- Yell, Scotland, United Kingdom
- Updated
- 22 Jul 2026
- Source
- Shetland News
ConstructChat
Ask ConstructChat about Yell HVAC Connection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A proposed High Voltage Alternating Current (HVAC) connection to link the island of Yell to the expanded electricity transmission system on mainland Shetland. The project includes a new substation in Yell to connect the Energy Isles and Beaw Field wind farms, and a subsea cable to the Shetland mainland. Construction is estimated to begin after 2028. |
Original sector | Energy |
Location
Country | United Kingdom (UK) |
State | Scotland |
City | Yell |
Source
Source | Shetland News |
URL |
More Details
Record type | Project |
Sector | Wind, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-06-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
