Yellow line of Bangkok mass rapid transit (MRT) system
Sector: Mass Transit • Location: Thailand
Source: World Bank Group
The project involves the construction and operation of the 30 KM Yellow Line of the mass rapid transit (MRT) system between Lat Phrao in Bangkok and Samrong in Samut Prakan province. It will connect with existing MRT lines such as Green Line and Airport Rail Link), and new MRT lines such as Blue and Orange Lines. The project includes also 23 stations, 1 depot, 1 one park & ride building. The Yello
- Status
- Prospective
- Sector
- Mass Transit, Airport, Car parking, Consumer Products, Power Generation (CCGT), Rail, Government, Automotive, Commercial
- Location
- Thailand
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Yellow line of Bangkok mass rapid transit (MRT) system
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction and operation of the 30 KM Yellow Line of the mass rapid transit (MRT) system between Lat Phrao in Bangkok and Samrong in Samut Prakan province. It will connect with existing MRT lines such as Green Line and Airport Rail Link), and new MRT lines such as Blue and Orange Lines. The project includes also 23 stations, 1 depot, 1 one park & ride building. The Yellow line project runs alongside with the Pink Line project The project SPV is Eastern Bangkok Monorail Company Limited (EBM). The sponsors are BTS Group Holdings Plc (75%), Ratchaburi Electricity Generating Holding Plc (10%) and Sino-Thai Engineering and Construction Plc (15%). The SPV submitted the most competitive offer and was selected as the preferred bidder in December 2016. The 33-year concession agreements with Mass Rapid Transit Authority of Thailand (MRTA) were signed in June 2017. EBM will have the rights to operate the line, and receive farebox revenues, commercial development fees, and parking fees. Commercial operations are expected to commence in 2021. The project cost is around THB 51.9 billion ($ 1.656 billion). Asian Development Bank (ADB) committed THB 4.95 billion or $ 157.36 million loan. Other banks included in the project are Bankgkok Bank, Krung Thai Bank and Siam Commercial Bank. The government will provide THB 25.05 billion or $ 796.33 million subsidies during the first 10 years of the operation in equal instalments. Financial close was announced on 4 June 2019. https://www.adb.org/news/adb-private-sector-financing-supports-two-new-bangkok-metro-lines https://ijglobal.com/data/transaction/35724/bangkok-yellow-mrt-line-304km-ppp https://www.nationthailand.com/Corporate/30328970 |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Thailand |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Airport, Car parking, Consumer Products, Power Generation (CCGT), Rail, Government, Automotive, Commercial |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
