Yellow Rosebush Energy Center Phase 1 400MW/400MW
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Yellow Rosebush Energy Center is a proposed solar photovoltaic energy generation facility with a generating capacity of approximately 800 megawatts (MWs). The facility would be located within a site boundary of approximately 8,075 acres (12.6 sq. miles) of private land zoned for Exclusive Farm Use (EFU) in Wasco and Sherman counties. In addition to the proposed solar photovoltaic arrays, the facil
- Status
- Prospective
- Sector
- Commercial, Solar, Energy Storage, Power Generation (CCGT), Raw Materials, Manufacturing (Industrial)
- Location
- Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Yellow Rosebush Energy Center Phase 1 400MW/400MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Yellow Rosebush Energy Center is a proposed solar photovoltaic energy generation facility with a generating capacity of approximately 800 megawatts (MWs). The facility would be located within a site boundary of approximately 8,075 acres (12.6 sq. miles) of private land zoned for Exclusive Farm Use (EFU) in Wasco and Sherman counties. In addition to the proposed solar photovoltaic arrays, the facility is proposed to include an up to 800 MW battery energy storage system; a collector substation;... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Solar, Energy Storage, Power Generation (CCGT), Raw Materials, Manufacturing (Industrial) |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
