Yellow Rosebush Energy Center Phase 1 400MW/400MW
Sector: Manufacturing (Industrial) • Location: Oregon, United States of America
Source: Dodge
Yellow Rosebush Energy Center is a proposed solar photovoltaic energy generation facility with a generating capacity of approximately 800 megawatts (MWs). The facility would be located within a site boundary of approximately 8,075 acres (12.6 sq. miles) of private land zoned for Exclusive Farm Use (EFU) in Wasco and Sherman counties. In addition to the proposed solar photovoltaic arrays, the facil
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Energy Storage, Commercial, Raw Materials, Solar
- Location
- Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Yellow Rosebush Energy Center Phase 1 400MW/400MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Yellow Rosebush Energy Center is a proposed solar photovoltaic energy generation facility with a generating capacity of approximately 800 megawatts (MWs). The facility would be located within a site boundary of approximately 8,075 acres (12.6 sq. miles) of private land zoned for Exclusive Farm Use (EFU) in Wasco and Sherman counties. In addition to the proposed solar photovoltaic arrays, the facility is proposed to include an up to 800 MW battery energy storage system; a collector substation;... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Energy Storage, Commercial, Raw Materials, Solar |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
