Yeongdong Pumped Storage Power Plant Units 1 and 2
One of 4,504 projects Taiyo tracks in South Korea.
Source: Chosun Biz
Doosan Enerbility signed a contract with Korea Hydro & Nuclear Power to supply main equipment for the Yeongdong pumped storage power plant units 1 and 2. The project has a capacity of 500 MW and is expected to be completed by 2030. It is the first new pumped storage power plant construction in South Korea in about 14 years. Doosan Enerbility will handle the overall design, manufacturing, and insta
- Status
- Closed
- Sector
- Hydro, Manufacturing (Industrial), Nuclear, Power Generation (CCGT)
- Location
- Yeongdong, South Korea
- Updated
- 22 Jul 2026
- Source
- Chosun Biz
ConstructChat
Ask ConstructChat about Yeongdong Pumped Storage Power Plant Units 1 and 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Doosan Enerbility signed a contract with Korea Hydro & Nuclear Power to supply main equipment for the Yeongdong pumped storage power plant units 1 and 2. The project has a capacity of 500 MW and is expected to be completed by 2030. It is the first new pumped storage power plant construction in South Korea in about 14 years. Doosan Enerbility will handle the overall design, manufacturing, and installation of equipment including turbines, generators, and electrical and control facilities. The plant will be the first in the country to apply variable-speed equipment capable of adjusting power output. |
Original sector | Energy |
Budget |
Location
Country | South Korea |
City | Yeongdong |
Source
Source | Chosun Biz |
URL |
More Details
Record type | Project |
Sector | Hydro, Manufacturing (Industrial), Nuclear, Power Generation (CCGT) |
Article published date | 2025-06-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
