Yerevan Gas-Fired Combined-Cycle Power Project
Sector: Water Supply and Storage • Location: Armenia
Source: Asian Development Bank (ADB)
The project is a 250MW gas fired combined cycle power plant (CCPP). The power plant, utilizing natural gas as fuel, is located on land acquired from the Yerevan Thermal Power Plant CJSC (YTPP), owned by the Ministry of Energy Infrastructure and Natural Resources. The project site is located 10 km from Yerevan, adjacent to the existing power plant operated by YTPP.
- Sector
- Water Supply and Storage, Power Generation (CCGT), Fertilizers, Commercial, Geothermal, Natural Gas, Government
- Location
- Armenia
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Yerevan Gas-Fired Combined-Cycle Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is a 250MW gas fired combined cycle power plant (CCPP). The power plant, utilizing natural gas as fuel, is located on land acquired from the Yerevan Thermal Power Plant CJSC (YTPP), owned by the Ministry of Energy Infrastructure and Natural Resources. The project site is located 10 km from Yerevan, adjacent to the existing power plant operated by YTPP. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Armenia |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Fertilizers, Commercial, Geothermal, Natural Gas, Government |
Article published date | 2025-07-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
