Yerevan Metro Rehabilitation Project
Sector: Mass Transit • Location: Armenia
Source: European Bank for Reconstruction and Development (EBRD)
The EBRD is considering a project to cover emergency investments in the Yerevan Metro, covering immediate rehabilitation needs including safety upgrades. The investment is part of the plan to improve and reform public transport services in the capital of Armenia. The operation would primarily benefit lower-income groups, who rely on the poorly maintained metro system. The proposed project will hav
- Status
- Closed
- Sector
- Mass Transit, Government, Residential
- Location
- Armenia
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Yerevan Metro Rehabilitation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The EBRD is considering a project to cover emergency investments in the Yerevan Metro, covering immediate rehabilitation needs including safety upgrades. The investment is part of the plan to improve and reform public transport services in the capital of Armenia. The operation would primarily benefit lower-income groups, who rely on the poorly maintained metro system. The proposed project will have the following transition impact: The EBRD loan will be provided to Yerevan Metropolitan Karen Demirchyan CJSC (Yerevan Metro Company), under a sovereign guarantee. The Company is managed by the Yerevan Municipality and by the Board of Directors. The Company’s ultimate shareholder is the Government of the Republic of Armenia, represented by the Yerevan Municipality. The proposal is for a loan of up to EUR 5.0 million from the EBRD. The total project cost is estimated to be up to EUR 16.63 million. On top of the Bank’s loan, the European Investment Bank is also considering a loan of EUR 5 million and the EU’s Neighbourhood Investment Facility has approved a grant in the amount of EUR 5 million. Screened B (2008). Any issues associated with the proposed Project could be identified and mitigated through an environmental and social analysis. An environmental, health and safety audit of existing facilities is required to identify any risks and issues of concern. A Technical Review report, identifying various options for the rehabilitation of the Yerevan metro, has been reviewed by the Bank to date. An independent due diligence will assess environmental and social impacts associated with a chosen rehabilitation option when confirmed. The availability of an adequate risk assessment and emergency plans will be addressed by the due diligence. An Environmental and Social Plan will be developed based on the findings of the ESDD, and agreed prior to Final Review of the Project. Pre-signing: Post-signing: |
Original sector | Municipal Infrastructure |
Location
Country | Armenia |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Government, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
