logo
ProjectClosed

Yixing Pumped Storage Project

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

The Yixing Pumped Storage Project for China's development objective is to increase the overall efficiency of the power sector in Jiangsu Province in two ways: a) design and implementation of a restructuring of the power sector to further competition at the generation level and to provide large consumers access to generators, and b) construction of a pumped storage plant (4 x 250 MW) in Yixing to e

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Hydro, Government
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Yixing Pumped Storage Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Yixing Pumped Storage Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Yixing Pumped Storage Project for China's development objective is to increase the overall efficiency of the power sector in Jiangsu Province in two ways: a) design and implementation of a restructuring of the power sector to further competition at the generation level and to provide large consumers access to generators, and b) construction of a pumped storage plant (4 x 250 MW) in Yixing to ease acute peaking problems and improve the generation mix that will create the conditions for more flexible dispatch and improved supply reliability an essential requirement for well-functioning competitive markets. The project components are: 1) construction of the Yinxing pumped storage power plant, a new upper reservoir, new main dam and subsidiary dam, and the underground powerhouse; 2) assistance to the restructuring of the power sector; and 3) construction of a double circuit transmission line to connect the Yixing pumped storage plant to the East China 500 KV network. The project will contribute to the Bank's energy sector strategy for China by assisting in making a smooth transition from a fully state-owned monopolistic sector to a diversely owned, market-oriented sector in which are promoted clean fuels, renewable energy, energy efficiency and assistance to poor western areas to develop their energy resources for local growth and export to other regions.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project