Yiyuan Integrated Biomass PPP Project
Sector: Power Generation (CCGT) • Location: China
Source: InfraPPPWorld
The project is designed with an annual biomass processing capacity of 300,000 tonnes, and is expected to generate approximately 210 million kWh of electricity annually, for an operation period of no less than 30 years.
- Status
- Closed
- Sector
- Power Generation (CCGT), Biomass
- Location
- China
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Yiyuan Integrated Biomass PPP Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is designed with an annual biomass processing capacity of 300,000 tonnes, and is expected to generate approximately 210 million kWh of electricity annually, for an operation period of no less than 30 years. |
Original sector | Energy |
Procurement method |
Location
Country | China |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Biomass |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in China
- Yangjiang Nuclear Power Plant Guangdong Province
- Shidao Bay Nuclear Power Plant
- Sanmen Nuclear Power Plant Zhejiang Province
- Baihetan Hydropower Project China
- The Ertan China Hydropower Plant Project
- Yebatan Hydropower Project
- Qinshan Nuclear Power Plant Haiyan County Zhejiang
- Lingao Nuclear Power Station Guangdong
