Yoakum FM 318 Sewer Lift Station Rehabilitation
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge USA
Scope - The Project includes Materials, Labors and Equipment for construction include replacement of two (2) existing submersible sewer pumps, safety grating on existing hatches, bypass pumping, replacement of one (1) flow meter, replacement of four (4) float switches, replacement of one (1) transducer and all other appurtenances and labor necessary to complete construction and restore the site to
- Status
- Under Construction
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Yoakum, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Yoakum FM 318 Sewer Lift Station Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes Materials, Labors and Equipment for construction include replacement of two (2) existing submersible sewer pumps, safety grating on existing hatches, bypass pumping, replacement of one (1) flow meter, replacement of four (4) float switches, replacement of one (1) transducer and all other appurtenances and labor necessary to complete construction and restore the site to existing conditions. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Yoakum |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
