logo
ProjectClosed

YONGSAN GANG

One of 8,530 projects Taiyo tracks in Korea, Republic of.

Source: World Bank Group

The principal features of the Second Yong San Gang Irrigation Project are: (a) construction of an estuary dam across the mouth of the Yong San Gang, consisting of an embankment, a concrete sluice and a navigation lock; (b) construction of a sea dike; (c) construction of 16 pumping stations to serve the land to be reclaimed and developed; (d) construction of main and secondary canals; (e) reclamati

Status
Closed
Sector
Road, Water Supply and Storage, Waste Processing and Treatment, Hydro, Cement, Residential, Raw Materials, Government, Commercial
Location
South Korea
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about YONGSAN GANG

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “YONGSAN GANG” is an infrastructure initiative in the Road sector, located in Korea, Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The principal features of the Second Yong San Gang Irrigation Project are: (a) construction of an estuary dam across the mouth of the Yong San Gang, consisting of an embankment, a concrete sluice and a navigation lock; (b) construction of a sea dike; (c) construction of 16 pumping stations to serve the land to be reclaimed and developed; (d) construction of main and secondary canals; (e) reclamation of tidal land through land leveling and construction of canals, drains and farm roads; (f) land development comprising land consolidation of existing paddy, conversion of upland to irrigated paddy, development of upland for irrigation, and tertiary canals and drains on existing paddy; (g) construction in the project area of the office buildings, warehouses, access roads and a temporary pier required for the construction of the estuary dam; and (h) provision of the services of consultants to assist in project implementation and in preparation of feasibility studies for future development stages on the Yong San Gang Basin.

Original sector

Agriculture, Fishing and Forestry

Location

Country

South Korea

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Waste Processing and Treatment, Hydro, Cement, Residential, Raw Materials, Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project