logo

YONGSAN GANG

Sector: Road • Location: Korea, Republic of

Source: World Bank Group

Project
Closed

The principal features of the Second Yong San Gang Irrigation Project are: (a) construction of an estuary dam across the mouth of the Yong San Gang, consisting of an embankment, a concrete sluice and a navigation lock; (b) construction of a sea dike; (c) construction of 16 pumping stations to serve the land to be reclaimed and developed; (d) construction of main and secondary canals; (e) reclamati

Project Information FAQ

Project Information

5 Q
The project “YONGSAN GANG” is an infrastructure initiative in the Road sector, located in Korea, Republic of. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The principal features of the Second Yong San Gang Irrigation Project are: (a) construction of an estuary dam across the mouth of the Yong San Gang, consisting of an embankment, a concrete sluice and a navigation lock; (b) construction of a sea dike; (c) construction of 16 pumping stations to serve the land to be reclaimed and developed; (d) construction of main and secondary canals; (e) reclamation of tidal land through land leveling and construction of canals, drains and farm roads; (f) land development comprising land consolidation of existing paddy, conversion of upland to irrigated paddy, development of upland for irrigation, and tertiary canals and drains on existing paddy; (g) construction in the project area of the office buildings, warehouses, access roads and a temporary pier required for the construction of the estuary dam; and (h) provision of the services of consultants to assist in project implementation and in preparation of feasibility studies for future development stages on the Yong San Gang Basin.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data