Youth Career Development Program
The status, timeline and source of this project. A free account opens every field.
Source: Grants.gov
This announcement is not a request for applications. This announcement is to provide public notice of the National Park Service’s intention to award a task agreement under a previously competed or single source justified master cooperative agreement. Specifically, SCA will:
- Work with NPS staff to develop a summer youth career exploration program that engages diverse youth from both the local
- Status
- Closed
- Sector
- Automotive, Car parking, Education, Rail, Government, Manufacturing (Industrial)
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Youth Career Development Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This announcement is not a request for applications. This announcement is to provide public notice of the National Park Service’s intention to award a task agreement under a previously competed or single source justified master cooperative agreement. Specifically, SCA will: 1) Work with NPS staff to develop a summer youth career exploration program that engages diverse youth from both the local community and the broader region in learning about careers in the National Park Service and similar organizations. 2) Assist in the selection of six interns (1 resource management intern, 1 leader/mentor, 2 regional interns, 2 local interns). Applications will be forwarded to the NPS for consideration. 3) Place and maintain qualified individuals who are acceptable to the NPS for Leader/Mentor Internship PO-00723408 (11 weeks, 40 hours a week), Local Summer Internship PO-00723407 (8 weeks, 40 hours a week), Regional Summer Internship PO-00723406 (8 weeks, 40 hours per week), and Resource Management Intern PO-00724008 (36 weeks, 40 hours per week) 4) Continue long-standing efforts of the NPS to provide opportunities for public service, youth employment, minority youth development and training, and participation of young adults in accomplishing conservation related work. 5) Provide a stipend for subsistence; uniform and name badges during period of service; travel to and from the park for the six interns for the duration of their participation in this project; and a local community allowance for the resource management intern and commuting vehicle for the leader/mentor and summer regional and local interns. 6) Provide housing for the six interns. 7) Accept tools, equipment, and facilities furnished by Marsh-Billings-Rockefeller NHP on a loan basis only; all such items shall be returned in the same condition received except for normal wear and tear in project use, in accordance with the terms set forth in Article VII of the Master Cooperative Agreement # P15AC00031 and 43 CFR 12. 8) Manage and carry out all administrative functions associated with the provision of services under this agreement to include payroll processing and purchasing. 9) Provide an orientation prior to the start of each internship that introduces applicants to benefits/support provided by SCA, i.e. internship benefits including a living allowance, housing allowance, travel allowance, AmeriCorps Education awards, and worker’s compensation insurance. 10) In addition, SCA provides Risk Management oversight including access for both members and supervisors to their 24-hour emergency response hotline. SCA staff will serve as a resource for interns throughout the internship, providing advice and guidance. 11) Provide for 25 % In Kind Match |
Budget |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Automotive, Car parking, Education, Rail, Government, Manufacturing (Industrial) |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
