Yuan He Water Treatment Plant

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

In July of 2003, Pinang Water Ltd. (PWL) was awarded a 29-year BOT contract from the government of Yichun City to construct a 100,000 cubic meters per day water treatment plant on the Yuan River. The project was to be built in two phases of equal size (50,000 cubic meters per day). As of 2003, Yichun had only two water treatment facilities, each capable of producing a maximum of 50 million liter

Project Information FAQ

Project Information

4 Q
The project “Yuan He Water Treatment Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In July of 2003, Pinang Water Ltd. (PWL) was awarded a 29-year BOT contract from the government of Yichun City to construct a 100,000 cubic meters per day water treatment plant on the Yuan River. The project was to be built in two phases of equal size (50,000 cubic meters per day). As of 2003, Yichun had only two water treatment facilities, each capable of producing a maximum of 50 million liters of treated water per day, while the peak demand for water was 100 million liters. PWL was a Malaysian joint venture company owned by YLI Holdings (37%), PBA Holdings (26%) and KWI Far East Sdn Bhd (37%). The JV was formed to look for waterworks related projects outside of Malaysia. In 2004, Ranhill Utiltites of Malaysia purchased 70% of KWI Far East Sdh Bhd. The total cost of the project was estimated at US$9 million. The project was funded though internal capital provided by the shareholders of PWL with the balance financed through credit terms from the machinery suppliers. The completion of the first phase of the project was expected in mid 2004, while the entire project was expected to be completed by the end of 2004. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data