logo

Yuba 70 (Segment 4 & 5)

Sector: Power Transmission • Location: CA, United States of America

Source: US Department of Transportation (USDOT)

Project
Close

Other Agencies with Actions or Authorizations: California Department of the Army, US Army Corps of Engineers - Regulatory Description: The California Department of Transportation (Caltrans) proposes to  improve safety, goods movement and emergency evacuation along the State Route 70 corridor. This segment of State Route (SR) 70 is in Yuba County, north of Marysville, between Post Miles (PM) 16.2 f

Project Information FAQ

Project Information

5 Q
The project “Yuba 70 (Segment 4 & 5)” is an infrastructure initiative in the Power Transmission sector, located in CA, United States of America. Taiyo aggregates data on it from US Department of Transportation (USDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Other Agencies with Actions or Authorizations: California Department of the Army, US Army Corps of Engineers - Regulatory Description: The California Department of Transportation (Caltrans) proposes to  improve safety, goods movement and emergency evacuation along the State Route 70 corridor. This segment of State Route (SR) 70 is in Yuba County, north of Marysville, between Post Miles (PM) 16.2 from Laurellen/SR 70 intersection and 25.8 (0.1 miles south of the Butte County line). The project proposes to provide a five-lane cross-section within the full postmile limits; PM 16.2 – 25.8. Two 12-foot travel lanes and 8-foot shoulder would be provided in each direction with a 14-foot wide continuous center Two Way Left Turn Lane (TWLTL) bounded by a minimum 20-foot Clear Recovery Zone (CRZ). The CRZ will incorporate side slopes of 4:1 or flatter and necessitate removal of any physical obstructions such as trees, utility poles, and other fixed objects.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data