logo

Yuhang Waste-to-energy PPP project in Hangzhou

Sector: Power Generation (CCGT) • Location: China

Source: InfraPPPWorld

Project
Closed

The Hangzhou Waste-to-energy Project will follow a BOT (Build-Operate-Transfer) basis for a period of 30 years. The facility is equipped with four self-developed 750 tonnes/day mechanic grate furnaces, and two 35 MW straight condensing turbine power generators. It has a designed total daily household waste processing capacity of 3,000 tonnes.The leachate treatment facilities will have a daily leac

Project Information FAQ

Project Information

4 Q
The project “Yuhang Waste-to-energy PPP project in Hangzhou” is an infrastructure initiative in the Power Generation (CCGT) sector, located in China. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Hangzhou Waste-to-energy Project will follow a BOT (Build-Operate-Transfer) basis for a period of 30 years. The facility is equipped with four self-developed 750 tonnes/day mechanic grate furnaces, and two 35 MW straight condensing turbine power generators. It has a designed total daily household waste processing capacity of 3,000 tonnes.The leachate treatment facilities will have a daily leachate treatment capacity of 1,500 tonnes and the water produced from the leachate treatment complies with water quality standards allowing the utilisation of reused water in open-type recirculating cooling water systems, realising the "full reuse and nil discharge" of leachate.Once operational, the facility is expected to generate green electricity of over 290,000,000 kWh annually. The project will be constructed on a and its gas emission will comply with the Euro 2000 Standard.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data