logo
ProjectComplete

Yuzhno-Sakhalinsk District Heating Project

Sector: Power Generation (CCGT) • Location: Russia

Source: European Bank for Reconstruction and Development (EBRD)

Translated version of this PSD: Russian The EBRD is considering to extend a senior loan of up to RUB 450 million (EUR 11.3 million) to OJSC Sakhalinskaya Kommunalnaya Kompaniya (the “Company”) for rehabilitation of district heating infrastructure in the City of Yuzhno-Sakhalinsk (the “City”) in the Russian Far East. Transition impact is expected to be achieved through the: OJSC Sakhalinskaya Kommu

Status
Closed
Sector
Power Generation (CCGT), Power Transmission, Water Supply and Storage, Government, Residential
Location
Russia
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Yuzhno-Sakhalinsk District Heating Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Yuzhno-Sakhalinsk District Heating Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Russia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Translated version of this PSD: Russian The EBRD is considering to extend a senior loan of up to RUB 450 million (EUR 11.3 million) to OJSC Sakhalinskaya Kommunalnaya Kompaniya (the “Company”) for rehabilitation of district heating infrastructure in the City of Yuzhno-Sakhalinsk (the “City”) in the Russian Far East. Transition impact is expected to be achieved through the: OJSC Sakhalinskaya Kommunalnaya Kompaniya is a district heating, water and wastewater utility, 51.81 per cent owned by the City and 48.19 per cent by JSC SakhalinEnergo, a regional power generating company ultimately owned by the Russian Federation. Senior corporate loan to the Company of up to RUB 450 million (EUR 11.3 million), guaranteed by the City. Up to RUB 600 million (EUR 15 million). The proposed project has been categorised B in accordance with the 2008 EBRD Environmental and Social (E&S) Policy, as the potential impacts are expected to be site specific and readily identifiable and addressed through mitigation measures. The environmental and social due diligence for the project, which is ongoing, includes an independent third party environmental and social audit to assess the Company’s management capacity and systems to manage environment, health, safety and labour issues in its operations and an analysis of the potential (future) E&S impacts and benefits. It will also assess the Company’s ability to carry out the Project in compliance with the Bank’s Performance Requirements. An Environmental and Social Action Plan (ESAP) will be prepared for the project, and a Stakeholder Engagement Plan will be developed that will include a grievance mechanism. Information on environmental and social performance and a summary of the agreed ESAP will be released to stakeholders. This PSD will be updated when the results of due diligence are known. The following Technical Cooperation will support the project: Pre-signing Post-signing

Original sector

Municipal Infrastructure

Location

Country

Russia

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Water Supply and Storage, Government, Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project