logo

Zafarabad 220kV Digital Substation

Sector: Power Transmission • Location: Zafarabad, Uzbekistan

Source: PR Newswire

Project
Completed

The Zafarabad 220kV Digital Substation is Uzbekistan's first digital substation, built by Shanghai Electric. It is designed to enhance the power supply in eastern Uzbekistan, featuring advanced technology for optimal performance and a capacity of 400 megawatts, effectively doubling the power supply to the Jizzakh region.

Status
Closed
Sector
Power Transmission, Power Generation (CCGT)
Location
Zafarabad, Uzbekistan
Updated
22 Jul 2026
Source
PR Newswire

ConstructChat

Ask ConstructChat about Zafarabad 220kV Digital Substation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Zafarabad 220kV Digital Substation” is an infrastructure initiative in the Power Transmission sector, located in Zafarabad, Uzbekistan. Taiyo aggregates data on it from PR Newswire.

Participants

Company

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Zafarabad 220kV Digital Substation is Uzbekistan's first digital substation, built by Shanghai Electric. It is designed to enhance the power supply in eastern Uzbekistan, featuring advanced technology for optimal performance and a capacity of 400 megawatts, effectively doubling the power supply to the Jizzakh region.

Original sector

Energy

Location

Country

Uzbekistan

City

Zafarabad

Source

Source

PR Newswire

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT)

Article published date

2025-02-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project