Zagreb Bond 2023
Sector: Waste Processing and Treatment • Location: Croatia
Source: IFC Project Disclosures
The proposed investment is an EUR 72.5 million subscription into a EUR 305 million, 5-year Sustainability Linked Bond (SLB), issued by Zagrebacki Holding d.o.o. (, or the “Group”). ZGH is a municipal utility holding company, 100% owned by the City of Zagreb, whose subsidiaries provide essential municipal services such as waste disposal, water supply, and gas distributio
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT), Water Supply and Storage, Government, Commercial
- Location
- Croatia
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about Zagreb Bond 2023
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed investment is an EUR 72.5 million subscription into a EUR 305 million, 5-year Sustainability Linked Bond (SLB), issued by Zagrebacki Holding d.o.o. (https://www.zgh.hr/en)(“ZGH”, or the “Group”). ZGH is a municipal utility holding company, 100% owned by the City of Zagreb, whose subsidiaries provide essential municipal services such as waste disposal, water supply, and gas distribution.ZGH has twelve subsidiaries that provide utility, commercial, and energy services, waste management (including municipal waste collection and management of a landfill and bio-waste facility), public water supply and drainage, road rehabilitation and maintenance, and pharmacies. ZGH also owns five companies and one institution and employs 7,126 people.The bond proceeds will be used to refinance an existing 7-year bond with a bullet maturity date of 15 July 2023, freeing up ZGH’s funds for future capital expenditures in critical and climate-friendly municipal infrastructure projects such as waste management, rehabilitation of water supply systems, equipment procurement, and renewable energy. |
Original sector | other |
Location
Country | Croatia |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT), Water Supply and Storage, Government, Commercial |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
