Zaijia Water Supply Project

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

In January 1998, the China Water Company (CWC) was awarded a BOT contract for the development, construction and operation of the Zaijia Water Supply Project. The project consisted of 5 parts: 1) 32 intake wells, 2) 14.8 km of transmission pipelines, 3) a plant which treats 100,000 tons of water per day 4) power transmission and transformation and 5) automated control center. The plant was to be t

Project Information FAQ

Project Information

4 Q
The project “Zaijia Water Supply Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In January 1998, the China Water Company (CWC) was awarded a BOT contract for the development, construction and operation of the Zaijia Water Supply Project. The project consisted of 5 parts: 1) 32 intake wells, 2) 14.8 km of transmission pipelines, 3) a plant which treats 100,000 tons of water per day 4) power transmission and transformation and 5) automated control center. The plant was to be the main source of drinking water for the 740,000 residents of the Tiexi District. To implement the contract, Shenyang CWC was created as the project company which was a joint venture formed by CWC and the state-owned Shenyang General Water Supply Company (exact shares were undisclosed). As of 2002, CWC itself was owned by Thames Water (a subsidiary of RWE) (48.8%) and Sime Darby Bhd. of Malaysia (33.3%). Total investment was estimated at US$25 million. Construction began in November 1996 and supply began in January 1998. No information on contract duration was available. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data