Zajak Drive Trail Project
Sector: Water Supply and Storage • Location: Baraboo, Wisconsin, United States of America
Source: Dodge
The Project includes the following Work: Construction of a paved trail along the north side of Zajak Drive, extending from Connie Road to the west end of the recently constructed parking lot for the West Baraboo Village Park. Work shall include but is not limited to: Unclassified Excavation Traffic Control Erosion Control Storm Sewer Installation Asphalt or Concrete Pavement and Base Course Concre
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Mass Transit, Government, Road, Power Transmission, Power Generation (CCGT), Car parking, Rail, Commercial, Waste Processing and Treatment, Automotive
- Location
- Baraboo, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Zajak Drive Trail Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Construction of a paved trail along the north side of Zajak Drive, extending from Connie Road to the west end of the recently constructed parking lot for the West Baraboo Village Park. Work shall include but is not limited to: Unclassified Excavation Traffic Control Erosion Control Storm Sewer Installation Asphalt or Concrete Pavement and Base Course Concrete Sidewalk, Curb and Gutter Turf/Site Restoration Coordination with Private Utility Contractors |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Baraboo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Mass Transit, Government, Road, Power Transmission, Power Generation (CCGT), Car parking, Rail, Commercial, Waste Processing and Treatment, Automotive |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
