logo

Zambia - Feasibility study for upscaling smallholder irrigation systems for climate change adaptation

Sector: Raw Materials • Location: Zambia

Source: African Development Bank (AfDB)

Project

The Feasibility studies are an integral part of the Up-scaling Smallholder Irrigation project. This project (Up-scaling Smallholder Irrigation project) is designed to prepare an irrigation investment project that would upscale the successful interventions introduced under the Small-Scale Irrigation Project. It will be implemented through three (3) components, including: (i) Component 1: Prefeasibi

Project Information FAQ

Project Information

4 Q
The project “Zambia - Feasibility study for upscaling smallholder irrigation systems for climate change adaptation” is an infrastructure initiative in the Raw Materials sector, located in Zambia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Feasibility studies are an integral part of the Up-scaling Smallholder Irrigation project. This project (Up-scaling Smallholder Irrigation project) is designed to prepare an irrigation investment project that would upscale the successful interventions introduced under the Small-Scale Irrigation Project. It will be implemented through three (3) components, including: (i) Component 1: Prefeasibility, Feasibility Studies and Detailed Designs; (ii) Component 2: Integrated Safeguard System Studies; and (iii) Component 3: Project Management. The component 1, which comprises the feasibility studies, will be implemented through three sub-components, and in three subsequent phases. These studies will be base on a pre-feasibility study findings. A feasibility report is expected in this study and would provide (1) a summary document, detailing all findings of the feasibility assessments; and (2) include more detailed assessments, including sub-project. The duration of the project would be 24 months from the time of project effectiveness. Its total cost is estimated at € 1,600,000, out of which the African Water Facility would finance € 1,400,000 (87.5%) (net of taxes and duties), while the Government of the Republic of Zambia would contribute € 200,000 (12.5%; in-kind and incash).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data