Zambia - Feasibility study for upscaling smallholder irrigation systems for climate change adaptation
Sector: Raw Materials • Location: Zambia
Source: African Development Bank (AfDB)
The Feasibility studies are an integral part of the Up-scaling Smallholder Irrigation project. This project (Up-scaling Smallholder Irrigation project) is designed to prepare an irrigation investment project that would upscale the successful interventions introduced under the Small-Scale Irrigation Project. It will be implemented through three (3) components, including: (i) Component 1: Prefeasibi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Feasibility studies are an integral part of the Up-scaling Smallholder Irrigation project. This project (Up-scaling Smallholder Irrigation project) is designed to prepare an irrigation investment project that would upscale the successful interventions introduced under the Small-Scale Irrigation Project. It will be implemented through three (3) components, including: (i) Component 1: Prefeasibility, Feasibility Studies and Detailed Designs; (ii) Component 2: Integrated Safeguard System Studies; and (iii) Component 3: Project Management. The component 1, which comprises the feasibility studies, will be implemented through three sub-components, and in three subsequent phases. These studies will be base on a pre-feasibility study findings. A feasibility report is expected in this study and would provide (1) a summary document, detailing all findings of the feasibility assessments; and (2) include more detailed assessments, including sub-project. The duration of the project would be 24 months from the time of project effectiveness. Its total cost is estimated at € 1,600,000, out of which the African Water Facility would finance € 1,400,000 (87.5%) (net of taxes and duties), while the Government of the Republic of Zambia would contribute € 200,000 (12.5%; in-kind and incash). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
