logo
Project

Zambia - Feasibility study for upscaling smallholder irrigation systems for climate change adaptation

Sector: Raw Materials • Location: Zambia

Source: African Development Bank (AfDB)

The Feasibility studies are an integral part of the Up-scaling Smallholder Irrigation project. This project (Up-scaling Smallholder Irrigation project) is designed to prepare an irrigation investment project that would upscale the successful interventions introduced under the Small-Scale Irrigation Project. It will be implemented through three (3) components, including: (i) Component 1: Prefeasibi

Sector
Raw Materials, Commercial, Water Supply and Storage, Government
Location
Zambia
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Zambia - Feasibility study for upscaling smallholder irrigation systems for climate change adaptation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Zambia - Feasibility study for upscaling smallholder irrigation systems for climate change adaptation” is an infrastructure initiative in the Raw Materials sector, located in Zambia. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Feasibility studies are an integral part of the Up-scaling Smallholder Irrigation project. This project (Up-scaling Smallholder Irrigation project) is designed to prepare an irrigation investment project that would upscale the successful interventions introduced under the Small-Scale Irrigation Project. It will be implemented through three (3) components, including: (i) Component 1: Prefeasibility, Feasibility Studies and Detailed Designs; (ii) Component 2: Integrated Safeguard System Studies; and (iii) Component 3: Project Management. The component 1, which comprises the feasibility studies, will be implemented through three sub-components, and in three subsequent phases. These studies will be base on a pre-feasibility study findings. A feasibility report is expected in this study and would provide (1) a summary document, detailing all findings of the feasibility assessments; and (2) include more detailed assessments, including sub-project. The duration of the project would be 24 months from the time of project effectiveness. Its total cost is estimated at € 1,600,000, out of which the African Water Facility would finance € 1,400,000 (87.5%) (net of taxes and duties), while the Government of the Republic of Zambia would contribute € 200,000 (12.5%; in-kind and incash).

Original sector

Agriculture, Forestry, Fishing

Budget

Location

Country

Zambia

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Commercial, Water Supply and Storage, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project