logo

Zambia - Itezhi-Tezhi Power Project

Sector: Power Generation (CCGT) • Location: Zambia

Source: African Development Bank (AfDB)

Project

The project involves the development, construction, operation and maintenance of a 120MW base load hydro power plant at the site of the ITT dam on the Kafue River in Zambia, and an electricity transmission line to transport energy to proposed substations in Mumbwa and West Lusaka. The project will bring power from the Itezhi-Tezhi Power Company (IPTC) power plant to a new substation located in Mum

Project Information FAQ

Project Information

4 Q
The project “Zambia - Itezhi-Tezhi Power Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Zambia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the development, construction, operation and maintenance of a 120MW base load hydro power plant at the site of the ITT dam on the Kafue River in Zambia, and an electricity transmission line to transport energy to proposed substations in Mumbwa and West Lusaka. The project will bring power from the Itezhi-Tezhi Power Company (IPTC) power plant to a new substation located in Mumbwa via a 220 kV single circuit line 142 km long, and to the West Lusaka substation via a 330-kV, 134-km dual-circuit line. Its implementation will bring benefits both locally and nationally, through expanded access to electricity and increased employment and social services. The construction of the plant should last 41 months and that of the transmission line 18 months. The cost of the plant will be US $ 239.05 million and the cost of the transmission line will be US $ 111.36 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data