logo
Project

Zambia - Itezhi-Tezhi Power Project

Sector: Power Generation (CCGT) • Location: Zambia

Source: African Development Bank (AfDB)

The project involves the development, construction, operation and maintenance of a 120MW base load hydro power plant at the site of the ITT dam on the Kafue River in Zambia, and an electricity transmission line to transport energy to proposed substations in Mumbwa and West Lusaka. The project will bring power from the Itezhi-Tezhi Power Company (IPTC) power plant to a new substation located in Mum

Sector
Power Generation (CCGT), Hydro, Water Supply and Storage, Government
Location
Zambia
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Zambia - Itezhi-Tezhi Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Zambia - Itezhi-Tezhi Power Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Zambia. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the development, construction, operation and maintenance of a 120MW base load hydro power plant at the site of the ITT dam on the Kafue River in Zambia, and an electricity transmission line to transport energy to proposed substations in Mumbwa and West Lusaka. The project will bring power from the Itezhi-Tezhi Power Company (IPTC) power plant to a new substation located in Mumbwa via a 220 kV single circuit line 142 km long, and to the West Lusaka substation via a 330-kV, 134-km dual-circuit line. Its implementation will bring benefits both locally and nationally, through expanded access to electricity and increased employment and social services. The construction of the plant should last 41 months and that of the transmission line 18 months. The cost of the plant will be US $ 239.05 million and the cost of the transmission line will be US $ 111.36 million.

Original sector

Energy

Budget

Location

Country

Zambia

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Water Supply and Storage, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project