Zambia - Itezhi-Tezhi Power Project
Sector: Power Generation (CCGT) • Location: Zambia
Source: African Development Bank (AfDB)
The project involves the development, construction, operation and maintenance of a 120MW base load hydro power plant at the site of the ITT dam on the Kafue River in Zambia, and an electricity transmission line to transport energy to proposed substations in Mumbwa and West Lusaka. The project will bring power from the Itezhi-Tezhi Power Company (IPTC) power plant to a new substation located in Mum
- Sector
- Power Generation (CCGT), Hydro, Water Supply and Storage, Government
- Location
- Zambia
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Zambia - Itezhi-Tezhi Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the development, construction, operation and maintenance of a 120MW base load hydro power plant at the site of the ITT dam on the Kafue River in Zambia, and an electricity transmission line to transport energy to proposed substations in Mumbwa and West Lusaka. The project will bring power from the Itezhi-Tezhi Power Company (IPTC) power plant to a new substation located in Mumbwa via a 220 kV single circuit line 142 km long, and to the West Lusaka substation via a 330-kV, 134-km dual-circuit line. Its implementation will bring benefits both locally and nationally, through expanded access to electricity and increased employment and social services. The construction of the plant should last 41 months and that of the transmission line 18 months. The cost of the plant will be US $ 239.05 million and the cost of the transmission line will be US $ 111.36 million. |
Original sector | Energy |
Budget |
Location
Country | Zambia |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro, Water Supply and Storage, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Zambia
- Open for FDI through a majority stake/Development of a new project/Production, transmission and distribution of electricity/DEVELOPMENT OF CHIPOTA FALLS 200 KW MINI-HYDRO PROJECT
- Development of the 118.4MW Hydro Electricity Plant and Associated Transmission Facilities in Zambia
- Luswishi Farm Project
- Chingombe solar mini-grid project
- Chimanga Mini Hydro Power Project
- Umlimi Char-Briquettes Project
- Sikaunzwe Solar Mini-Grid Project
- Tomato and Vegetable Growing Project
