Zambia - Rehabilitation of Kafue Gorge Power Station Project
Sector: Power Generation (CCGT) • Location: Zambia
Source: African Development Bank (AfDB)
The proposed emergency assistance project aims at restoring 600 MW of the Kafue Gorge Hydroelectric Power Station before the end of 1989. The Kafue Gorge Hydroelectric Power Station, with an installed capacity of 900 MW is the largest power station in Zambia. It is situated on the Kafue River some 100 km south of the capital City of Lusaka. The rehabilitation of the Kafue Gorge Power Plant has b
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed emergency assistance project aims at restoring 600 MW of the Kafue Gorge Hydroelectric Power Station before the end of 1989. The Kafue Gorge Hydroelectric Power Station, with an installed capacity of 900 MW is the largest power station in Zambia. It is situated on the Kafue River some 100 km south of the capital City of Lusaka. The rehabilitation of the Kafue Gorge Power Plant has been devised in three phases: (i) restoration of a first 300 MW capacity to enable ZESCO to meet the national power demand and stop importations as soon as possible. (ii) Restoration of an additional 300 MW capacity to made Zambia self-sufficient in energy and have a reasonable operating reserve. (iii) Complete restoration of the power station with the commissioning of the last 300 MW capacity thereby enabling resumption of electricity exports. The present support covers only phase (i) and (ii) so that Zambia will as soon as possible be again in a position to export electricity and resume making earnings from the sale of this commodity to its neighbor Zimbabwe. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
