Zaratan Solar Cluster
Sector: Solar • Location: Castile and León, Spain
Source: Renewable Energy Magazine
The Zaratan cluster consists of three adjacent solar plants in the region of Castile and León with a total capacity that supplies nearly 50,000 households. It includes a 75 MW battery storage facility under development. The PV plants are expected to be completed by the end of 2026, saving 33,000 tonnes of CO2 annually.
- Status
- Under Construction
- Sector
- Solar, Energy Storage
- Location
- Castile and León, Spain
- Updated
- 22 Jul 2026
- Source
- Renewable Energy Magazine
ConstructChat
Ask ConstructChat about Zaratan Solar Cluster
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Zaratan cluster consists of three adjacent solar plants in the region of Castile and León with a total capacity that supplies nearly 50,000 households. It includes a 75 MW battery storage facility under development. The PV plants are expected to be completed by the end of 2026, saving 33,000 tonnes of CO2 annually. |
Original sector | Energy |
Location
Country | Spain |
State | Castile and León |
Source
Source | Renewable Energy Magazine |
URL |
More Details
Record type | Project |
Sector | Solar, Energy Storage |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
