Zaxby's - Santee, SC
One of 10,000+ projects Taiyo tracks in South Carolina.
Source: Dodge
New Construction Of A Ground Up Restaurant Including Dining Room, Kitchen, Restroom, Walk In Cooler/freezer, Storage, Covered/uncovered Patio As Well As New Utility Connections, New Mep Systems, And New Site Work & Parking. Existing Site & Building Demolition Work If Present Will Be Performed Under A Separate Permit
- Status
- Closed
- Sector
- Consumer Products, Commercial, Power Transmission, Car parking, Raw Materials, Automotive, Power Generation (CCGT)
- Location
- Santee, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Zaxby's - Santee, SC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New Construction Of A Ground Up Restaurant Including Dining Room, Kitchen, Restroom, Walk In Cooler/freezer, Storage, Covered/uncovered Patio As Well As New Utility Connections, New Mep Systems, And New Site Work & Parking. Existing Site & Building Demolition Work If Present Will Be Performed Under A Separate Permit |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Santee |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Commercial, Power Transmission, Car parking, Raw Materials, Automotive, Power Generation (CCGT) |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
