Zeevonk electrolytic hydrogen project
Sector: Hydrogen • Location: Netherlands
Source: Westwood Global Energy Group
Originally planned at 1GW capacity by 2029 in the Netherlands, delayed to 2033 and scaled down to 500MW due to postponed Delta Rhine Corridor pipeline. Developers withdrew from European Hydrogen Bank's second auction due to inability to meet 2030 operational deadline.
- Status
- Failure
- Sector
- Hydrogen
- Location
- Netherlands
- Updated
- 22 Jul 2026
- Source
- Westwood Global Energy Group
ConstructChat
Ask ConstructChat about Zeevonk electrolytic hydrogen project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Originally planned at 1GW capacity by 2029 in the Netherlands, delayed to 2033 and scaled down to 500MW due to postponed Delta Rhine Corridor pipeline. Developers withdrew from European Hydrogen Bank's second auction due to inability to meet 2030 operational deadline. |
Original sector | Energy Transition |
Location
Country | Netherlands |
Source
Source | Westwood Global Energy Group |
URL |
More Details
Record type | Project |
Sector | Hydrogen |
Article published date | 2025-09-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
