logo
ProjectStart

Zehner Grid Road Upgrades Clay Capping

One of 10,000+ projects Taiyo tracks in Saskatchewan.

Source: Dodge USA

The Rural Municipality (RM) of Lumsden No. 189 would like to upgrade Zehner Grid Road using the clay capping method. The project limits are from Provincial Highway No. 6 to the RM of Lumsden No. 189's boundary with the RM of Edenwold No. 158. The total distance of the project is 8.11 km. Zehner Road is classified as a low volume , heavy haul road with an avergage daily traffic count of less than 4

Status
Prospective
Sector
Automotive, Water Supply and Storage, Commercial, Government, Road, Waste Processing and Treatment
Location
Lumsden, Saskatchewan, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Zehner Grid Road Upgrades Clay Capping

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Zehner Grid Road Upgrades Clay Capping” is an infrastructure initiative in the Automotive sector, located in Lumsden, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Rural Municipality (RM) of Lumsden No. 189 would like to upgrade Zehner Grid Road using the clay capping method. The project limits are from Provincial Highway No. 6 to the RM of Lumsden No. 189's boundary with the RM of Edenwold No. 158. The total distance of the project is 8.11 km. Zehner Road is classified as a low volume , heavy haul road with an avergage daily traffic count of less than 400 vehicles per day. The existing roadway has an approximate width 9.8 metres. The current speed ...

Procurement method

Location

Country

Canada

State

Saskatchewan

City

Lumsden

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Automotive, Water Supply and Storage, Commercial, Government, Road, Waste Processing and Treatment

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project