logo

Zelenograd Wastewater Treatment

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

In December 1998 Berlinwasser Holdings AG received a 12.5 year build-operate-own-transfer contract for a wastewater treatment facility in Zelenograd, Russia. In 1998 the area of Zelenograd did not have its own treatment plant and was using a non-central facility located 40 kilometers northwest of the city of Moscow. Continued local growth meant that by 1998 the treatment capacity of the existing p

Status
Prospective
Sector
Commercial, Water Supply and Storage, Government, Waste Processing and Treatment
Location
Moscow City, Russia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Zelenograd Wastewater Treatment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Zelenograd Wastewater Treatment” is an infrastructure initiative in the Commercial sector, located in Moscow City, Russian Federation. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 1998 Berlinwasser Holdings AG received a 12.5 year build-operate-own-transfer contract for a wastewater treatment facility in Zelenograd, Russia. In 1998 the area of Zelenograd did not have its own treatment plant and was using a non-central facility located 40 kilometers northwest of the city of Moscow. Continued local growth meant that by 1998 the treatment capacity of the existing plant was exceeded and the discharge quality no longer complied with the required purification standards. German WTE was commissioned to design, finance, build and operate a new wastewater treatment plant with an average capacity of 140,000 cubic meters of wastewater per day. The new plant would have the potential to serve approximately 400,000 connected inhabitants. The initial cost of the project was projected to be US$70 million. Financial closure was reached in December 1998. The treatment plant started operation at the end of 2000 In October 2003, the subsidiary of BerlinWasser (WTE Wassertechnik GmbH) responsible for the project was acquired by the Austrian group EVN AG. None None

Original sector

Water and sewerage

Procurement method

Budget

Location

Country

Russia

State

Moscow City

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Government, Waste Processing and Treatment

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project