logo

Zenica CHP Plant Upgrade and Modernization Project

Sector: Water Supply and Storage • Location: Zenica-Doboj, Bosnia and Herzegovina

Source: World Bank Group

Project
Active

The project involves an upgrade and modernisation of a plant located in Zenica, Bosnia and Herzegovina whereby a combined heat and power plant (CHP) will replace coal-fired plant in Zenica, Bosnia and Herzegovina. The project entails the replacement of the existing coal boilers with gas-fired boilers and a steam-driven blower with an electric blower. The project will transfer the production of ste

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
Zenica-Doboj, Bosnia and Herzegovina
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Zenica CHP Plant Upgrade and Modernization Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Zenica CHP Plant Upgrade and Modernization Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Zenica-Doboj, Bosnia and Herzegovina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves an upgrade and modernisation of a plant located in Zenica, Bosnia and Herzegovina whereby a combined heat and power plant (CHP) will replace coal-fired plant in Zenica, Bosnia and Herzegovina. The project entails the replacement of the existing coal boilers with gas-fired boilers and a steam-driven blower with an electric blower. The project will transfer the production of steam and blast air for ArcelorMittal Zenica's steelworks and the production of district heating water for the City of Zenica. The SPV Toplana Zenica doo is formed by ArcelorMittal Zenica (50%), City of Zenica (20%), KPA Unicon (Finland) (15%) and Finnfund (15%), which is investing EUR 1.8 million or $ 2.04 millionin equity. The total project cost is EUR 53 million or $ 59.95 million. The debt financing amounts to EUR 46 million or $ 52.03 million. EBRD is providing EUR 28 million or $ 31.67 million loan from own account (EUR 23 million or $ 26.02 million from the Bank and EUR 5 million or $ 5.66 million of concessional financing from the International Cooperation and Development Fund (TaiwanICDF) and Banca Intesa Sanpaolo is providing a loan of up to EUR 18 million or $ 20.36 million. Financial close was reached on 15 March 2019. https://www.ebrd.com/news/2019/ebrd-secures-greener-energy-for-bosnian-city-of-zenica.html https://www.ebrd.com/work-with-us/projects/psd/toplana-zenica-doo.html https://zenica.arcelormittal.com/news-and-media/news/2018/october/10-10-2018.aspx?sc_lang=en http://www.icdf.org.tw/ct.asp?xItem=54677&ctNode=30881&mp=2 https://www.finnfund.fi/en/news/arcelormittal_zenica-bosnia-herzegovina/ https://www.finnfund.fi/en/investing/investments/arcelormittal-toplana-zenica/

Original sector

Energy

Budget

Location

Country

Bosnia and Herzegovina

State

Zenica-Doboj

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2024-05-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project