Zenica CHP Plant Upgrade and Modernization Project
Sector: Water Supply and Storage • Location: Zenica-Doboj, Bosnia and Herzegovina
Source: World Bank Group
The project involves an upgrade and modernisation of a plant located in Zenica, Bosnia and Herzegovina whereby a combined heat and power plant (CHP) will replace coal-fired plant in Zenica, Bosnia and Herzegovina. The project entails the replacement of the existing coal boilers with gas-fired boilers and a steam-driven blower with an electric blower. The project will transfer the production of ste
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Zenica-Doboj, Bosnia and Herzegovina
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Zenica CHP Plant Upgrade and Modernization Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves an upgrade and modernisation of a plant located in Zenica, Bosnia and Herzegovina whereby a combined heat and power plant (CHP) will replace coal-fired plant in Zenica, Bosnia and Herzegovina. The project entails the replacement of the existing coal boilers with gas-fired boilers and a steam-driven blower with an electric blower. The project will transfer the production of steam and blast air for ArcelorMittal Zenica's steelworks and the production of district heating water for the City of Zenica. The SPV Toplana Zenica doo is formed by ArcelorMittal Zenica (50%), City of Zenica (20%), KPA Unicon (Finland) (15%) and Finnfund (15%), which is investing EUR 1.8 million or $ 2.04 millionin equity. The total project cost is EUR 53 million or $ 59.95 million. The debt financing amounts to EUR 46 million or $ 52.03 million. EBRD is providing EUR 28 million or $ 31.67 million loan from own account (EUR 23 million or $ 26.02 million from the Bank and EUR 5 million or $ 5.66 million of concessional financing from the International Cooperation and Development Fund (TaiwanICDF) and Banca Intesa Sanpaolo is providing a loan of up to EUR 18 million or $ 20.36 million. Financial close was reached on 15 March 2019. https://www.ebrd.com/news/2019/ebrd-secures-greener-energy-for-bosnian-city-of-zenica.html https://www.ebrd.com/work-with-us/projects/psd/toplana-zenica-doo.html https://zenica.arcelormittal.com/news-and-media/news/2018/october/10-10-2018.aspx?sc_lang=en http://www.icdf.org.tw/ct.asp?xItem=54677&ctNode=30881&mp=2 https://www.finnfund.fi/en/news/arcelormittal_zenica-bosnia-herzegovina/ https://www.finnfund.fi/en/investing/investments/arcelormittal-toplana-zenica/ |
Original sector | Energy |
Budget |
Location
Country | Bosnia and Herzegovina |
State | Zenica-Doboj |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2024-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Bosnia and Herzegovina
- Zenica CHP Plant Upgrade and Modernization Project
- HDC Cardiac Hospital
- WATER AND SANITATION FEDERATION BIH
- WATER AND SANITATION RS
- WATER AND SANITATION RS II
- FLOOD PROTECTION MEASURES RS
- EMERGENCY FLOOD RELIEF AND PREVENTION
- Boosting Research and Innovation Potential of the Adriatic Cross-border Area in a Joint Research Initiative led by Metris Research Centre
