Zephyrhills WWTP Effluent Pump Station Upgrades
Closed · Florida · Last reported Oct 2024
Source: Dodge USA
SCOPE OF WORK The Work of this Project is defined as the following modifications to the existing Waste Water Treatment Plant. 1. Effluent Pump Station a. Demolishing the effluent wet well center wall and modifying the steel structure supporting the 5 vertical turbine pumps, including temporary shoring of pumps. b. Relocating existing control, instrumentation, and electrical panels and lighting. c.
- Status
- Closed
- Sector
- Power Generation (CCGT), Wind, Rail, Government, Steel, Water Supply and Storage, Waste Processing and Treatment, Metal, Commercial
- Location
- Zephyrhills, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Zephyrhills WWTP Effluent Pump Station Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SCOPE OF WORK The Work of this Project is defined as the following modifications to the existing Waste Water Treatment Plant. 1. Effluent Pump Station a. Demolishing the effluent wet well center wall and modifying the steel structure supporting the 5 vertical turbine pumps, including temporary shoring of pumps. b. Relocating existing control, instrumentation, and electrical panels and lighting. c. Installing a new steel deck (walkway) extension and railing. d. Installing a new effluent pump a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Zephyrhills |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind, Rail, Government, Steel, Water Supply and Storage, Waste Processing and Treatment, Metal, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
