logo

ZETES 3 Thermal Power Plant

Sector: Geothermal • Location: Turkey

Source: World Bank Group

Project
Active

In 2013, Eren Enerji Elektrik Üretim AS (Eren Enerji), a subsidiary of Eren Holding, began construction of a 1,320 MW coal fired ZETES 3 (Zonguldak Eren Termik Santrali III) power plant in Zonguldak, Turkey. Eren Enerji has two other coal fired power plants in Zonguldak – 160 MW Zetes 1 and 1,320 MW Zetes 2 that began operations in 2010. All plants run on imported bituminous coal, which arrives vi

Project Information FAQ

Project Information

5 Q
The project “ZETES 3 Thermal Power Plant” is an infrastructure initiative in the Geothermal sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2013, Eren Enerji Elektrik Üretim AS (Eren Enerji), a subsidiary of Eren Holding, began construction of a 1,320 MW coal fired ZETES 3 (Zonguldak Eren Termik Santrali III) power plant in Zonguldak, Turkey. Eren Enerji has two other coal fired power plants in Zonguldak – 160 MW Zetes 1 and 1,320 MW Zetes 2 that began operations in 2010. All plants run on imported bituminous coal, which arrives via a nearby coal port, also owned by Eren Enerji. The total cost of Zetes 3 was estimated at USD 1.05 billion. The project reached financial close in November 2013 by securing a loan of USD 400 million each from Garanati Bank and Isbank for a total debt of USD 800 million. The balance of USD 250 million was funded by Eren Enerji for a debt equity ratio of 76:24. The power plant with two units of 660 MW is expected to start operations in 2015 after a construction period of 21 months. Harbin Electric International Company Limited is the EPC contractor.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data