logo
ProjectCompleted

Zeus Ceramica

One of 7,229 projects Taiyo tracks in Ukraine.

Source: International Finance Corporation (IFC)

The project is Phase 2 of a green-field ceramic tile plant, CJSC Zeus Ceramica (“Zeus”), with a total annual production capacity of 4.3 million square meters of porcelain (ceramic granite) tiles in Slavyansk, Donetsk region. Phase I, the construction and installation of line 1 with an annual production capacity of 2.0 million square meters, was completed in March 2005. Phase II, the installation

Status
Closed
Sector
Government
Location
Ukraine
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Zeus Ceramica

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Zeus Ceramica” is an infrastructure initiative in the Government sector, located in Ukraine. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is Phase 2 of a green-field ceramic tile plant, CJSC Zeus Ceramica (“Zeus”), with a total annual production capacity of 4.3 million square meters of porcelain (ceramic granite) tiles in Slavyansk, Donetsk region. Phase I, the construction and installation of line 1 with an annual production capacity of 2.0 million square meters, was completed in March 2005. Phase II, the installation of line 2 with a capacity of 2.3 million square meters, is expected to be completed in the first quarter of 2007.Zeus is a joint venture between Emilceramica S.p.A., an Italian tile manufacturer and majority owner in Zeus, and CJSC Yuzhno-Oktiabrskie Gliny Yug (“YUG”), a Ukrainian supplier of clay and kaolin, the key raw materials in the production of ceramic tiles. YUG was started in the early 1990’s as a result of the privatization of several entities, including clay and kaolin quarries. YUG and its 50% owned joint venture CJSC Gliny Donbassa (“Donbass Clays”), which owns 5 quarries, supplies raw materials (clay and sand) as well as semi-finished products (mixes) to Zeus. YUG’s quarry will be depleted in approximately 3 years, while Donbass Clay has reserves for the next 25-50 years. Due to the interdependent structure of this project and its clay supply, both Zeus and Donbass clay operations were visited and reviewed for environmental and social performance during the appraisal.

Original sector

BB - Glazed Ceramic Tiles

Location

Country

Ukraine

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Government

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project