logo

Zhabei Oil-Fired Power Plant

Sector: Wind • Location: China

Source: World Bank Group

Project
Active

This 400 MW project is located in the Zhabei district of Shanghai. The project consists of a residual fuel-fired simple-cycle gas turbine peak-load power plant. The project was developed jointly by General Electric Capital Corporation and Shanghai Municipal Electric Power Company (SMEPC). The project was financed through both equity and debt. Equity of US $73 million was provided by SMEPC (70%) a

Project Information FAQ

Project Information

4 Q
The project “Zhabei Oil-Fired Power Plant” is an infrastructure initiative in the Wind sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This 400 MW project is located in the Zhabei district of Shanghai. The project consists of a residual fuel-fired simple-cycle gas turbine peak-load power plant. The project was developed jointly by General Electric Capital Corporation and Shanghai Municipal Electric Power Company (SMEPC). The project was financed through both equity and debt. Equity of US $73 million was provided by SMEPC (70%) and by GE Capital (30%). The sponsors also raised local currency debt equivalent to US $56 million. An additional US $124 million in US dollar debt was provided by a syndicate of international banks. The Zhabei project was the first power plant of its size in China to be financed on a non-recourse basis, with no guarantees provided by either the sponsors or the Chinese government. At the termination of the 17-year contract, full ownership of the plant is transferred to SMEPC. The financial statements of SMEPC were audited according to international accounting standards by Arthur Andersen prior to financing of the project. SMEPC has signed a PPA agreeing to purchase all of the output from the plant. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data