Zhanatas Wind Power Plant
Sector: Wind • Location: Kazakhstan
Source: World Bank Group
The project entails the construction of a 100 MW wind plant in Zhambyl region, Kazakhstan. Total investment stands at $ 136.2 million, the multilateral bank AIIB secured a debt of $ 46.7 million while the rest of the finance will be provided as an equity or debt. Concession period is 20 years. SPV is Zhanatas Wind-Power Station LLP, a JV between the sponsors China Power International Holding Limit
- Status
- Prospective
- Sector
- Wind, Power Generation (CCGT), Government, Commercial
- Location
- Kazakhstan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Zhanatas Wind Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of a 100 MW wind plant in Zhambyl region, Kazakhstan. Total investment stands at $ 136.2 million, the multilateral bank AIIB secured a debt of $ 46.7 million while the rest of the finance will be provided as an equity or debt. Concession period is 20 years. SPV is Zhanatas Wind-Power Station LLP, a JV between the sponsors China Power International Holding Limited and Visor Investments Cooperative U.A. Financial close occurred on December 12, 2019. http://cpihzhanatas.kz/mwg-internal/de5fs23hu73ds/progress?id=sC8ZHlyI97inu5sBCAMNbTJ01VbWJaGxkjEh8D31C1g, https://www.aiib.org/en/projects/approved/2019/_download/kazakhstan/Kazakhstan-100-MW-Zhantas-Wind-Power-Project.pdf |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Kazakhstan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
