logo

ZhangHu Railway

Sector: Mass Transit • Location: China

Source: World Bank

Project
Closed

The development objective of the Zhangjiakou Hohhot (ZhangHu) Railway Project for China is to improve accessibility and mobility by responding to existing and anticipated transport demand along the Hohhot-Zhangjiakou (to Beijing) corridor through the provision of additional railway capacity and reduction of transport time for passengers and freight. There are three components to the project. The f

Project Information FAQ

Project Information

5 Q
The project “ZhangHu Railway” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Zhangjiakou Hohhot (ZhangHu) Railway Project for China is to improve accessibility and mobility by responding to existing and anticipated transport demand along the Hohhot-Zhangjiakou (to Beijing) corridor through the provision of additional railway capacity and reduction of transport time for passengers and freight. There are three components to the project. The first component support the construction of a 286 km-long double-track, electrified, passenger-dedicated high-speed rail line between the northern cities of Zhangjiakou and Hohhot, including construction, renovation or rehabilitation of three stations, acquisition and installation of goods, maintenance equipment, and rolling stock, as well as land acquisition and resettlement. Of the six stations on this line, three new railway stations will be constructed, two existing stations renovated, and one existing station used. This railway line is an extension of the planned high-speed Intercity Beijing-Zhangjiakou Railway. The second component will finance the procurement of goods associated with the construction of the line and with its electrification, signaling, and communication systems, as well as operation and maintenance equipment and possibly technical assistance on policy aspects. The scope of such technical assistance (consultant services, training, and study tours) will be identified during implementation. The third component will begin in the second half of 2012. The construction period is expected to be 4 years with construction planned to begin in June 2013 and the line opened to traffic in June 2017.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data