logo

Zhangjiakou "source-grid-load-storage integration" demonstration project (Guyuan section) (200MW)

Sector: Wind • Location: China

Source: World Bank Group

Project
Active

The project comprises the construction of a 200-MW wind power project in Huanggainao Town, Guyuan County, Hebei Province, China. It is called Zhangjiakou ""source-grid-load-storage integration"" carbon neutrality demonstration project (Guyuan section). Construction started on September 10th, 2024. It has been sponsored and constructed by Hebei Zejing Construction Engineering Co., Ltd., a subsidia

Project Information FAQ

Project Information

4 Q
The project “Zhangjiakou "source-grid-load-storage integration" demonstration project (Guyuan section) (200MW)” is an infrastructure initiative in the Wind sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the construction of a 200-MW wind power project in Huanggainao Town, Guyuan County, Hebei Province, China. It is called Zhangjiakou ""source-grid-load-storage integration"" carbon neutrality demonstration project (Guyuan section). Construction started on September 10th, 2024. It has been sponsored and constructed by Hebei Zejing Construction Engineering Co., Ltd., a subsidiary of Guyuan County Agricultural Development Group (SOE). The investment amount is $157.3m (1.12 billion yuan). The capacity of 200MW will be separated in 32 6.25-MW wind turbines , and a hub height of 115m. A 220kV booster station and operation management center will be built to support the construction, equipped with a 30MW/60MWh energy storage system, and connected to the 220kV side of the Baituyao 500kV substation through a 220kV transmission line. The project is scheduled to be connected to the grid for power generation by the end of 2025. https://wind.imarine.cn/news/100404.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data