logo

Zhejiang Haiyan Fly Ash Landfill

Sector: Government • Location: China

Source: World Bank Group

Project
Active

The Project will be responsible for safe disposal of fly ash generated from Haiyan WtE Project of the Group. Total investment is RMB 85 million or $ 12.6 million. Storage capacity of the facility is 221,000 m3. Sponsor of the project is China Everbright. Type of concession is BOT (Build-Operate-Transfer) with concession period of 20 years (construction period inclusive). Financial close took place

Status
Prospective
Sector
Government, Biomass, Water Supply and Storage, Waste Processing and Treatment, Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Zhejiang Haiyan Fly Ash Landfill

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Zhejiang Haiyan Fly Ash Landfill” is an infrastructure initiative in the Government sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project will be responsible for safe disposal of fly ash generated from Haiyan WtE Project of the Group. Total investment is RMB 85 million or $ 12.6 million. Storage capacity of the facility is 221,000 m3. Sponsor of the project is China Everbright. Type of concession is BOT (Build-Operate-Transfer) with concession period of 20 years (construction period inclusive). Financial close took place on December 17, 2018. https://www.ebchinaintl.com/en/media/news_content.php?id=p181217 Accucom files

Original sector

Municipal Solid Waste

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Government, Biomass, Water Supply and Storage, Waste Processing and Treatment, Commercial

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project