logo

Zhejiang Shengzhou Waste-to-energy Plant Phase I

Active · China

Source: World Bank Group

Project
Active

The project involves the construction of phase I of Zhejiang Shengzhou Waste-to-energy Plant located in Shengzhou City, Zhejiang province of China. The 1st phase of project has a designed daily household waste processing capacity of 800 tonnes (292,000 tonnes/year). The 1st phase of plant will be equipped with two 400 tonnes/day grate furnaces and one set of 18 MW turbine power generator and is ex

Status
Prospective
Sector
Water Supply and Storage, Biomass, Commercial, Power Generation (CCGT), Wind, Government, Manufacturing (Industrial), Waste Processing and Treatment
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Zhejiang Shengzhou Waste-to-energy Plant Phase I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Zhejiang Shengzhou Waste-to-energy Plant Phase I” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the construction of phase I of Zhejiang Shengzhou Waste-to-energy Plant located in Shengzhou City, Zhejiang province of China. The 1st phase of project has a designed daily household waste processing capacity of 800 tonnes (292,000 tonnes/year). The 1st phase of plant will be equipped with two 400 tonnes/day grate furnaces and one set of 18 MW turbine power generator and is expected to generate electricity of around 120 million kWh per year. The 2nd phase will add capacity of further 400 tonnes/day. The sponsor China Everbright international Ltd signed a 30-year concession agreement under BOT (Build-Operate-Transfer) model. The concession period includes the construction as well. The project cost is approximately CNY 570 million or $ 84.83 million. Financial close was reached on 31 January 2019. https://www.ebchinaintl.com/en/media/news_content-p190131.html

Original sector

Municipal Solid Waste

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Biomass, Commercial, Power Generation (CCGT), Wind, Government, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project