logo
ProjectClosed

Zhengzhou Urban Rail Project

One of 10,000+ projects Taiyo tracks in China.

Source: World Bank Group

The objective of the Zhengzhou Urban Rail Project for China is to improve urban mobility for the population of Zhengzhou along the catchment area of Line 3 from Xin Liu Lu Station to Hang Hai Dong Lu Station. The project consists of the following four components: (1) Construction of Line 3. This component includes all construction activities for the Zhengzhou Urban Rail Line 3 (about 25.2 km) whic

Status
Closed
Sector
Mass Transit, Road, Water Supply and Storage, Rail, Power Generation (CCGT), Commercial, Government, Automotive
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Zhengzhou Urban Rail Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Zhengzhou Urban Rail Project” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Zhengzhou Urban Rail Project for China is to improve urban mobility for the population of Zhengzhou along the catchment area of Line 3 from Xin Liu Lu Station to Hang Hai Dong Lu Station. The project consists of the following four components: (1) Construction of Line 3. This component includes all construction activities for the Zhengzhou Urban Rail Line 3 (about 25.2 km) which starts at Xin Liu Lu station and ends at Hang Hai Dong Lu station. Line 3 will connect the city center of Zhengzhou with its northwest and southeast development areas. Line 3 includes 21 stations, which will be located underground and connected by tunnels. Six interchange stations to be constructed will provide convenient interchange with other urban rail lines. The Bank loan will support the construction of five stations and five tunnels located at the southeast end of the line. (2) Equipment for Line 3. This component includes equipment necessary to the operation of Line 3, such as rolling stock, power supply, control system, signaling system, communication system, monitoring system, fare collection system, safety and security system, ventilation and air conditioning system, water supply, sewerage and fire protection system, and station auxiliary equipment. This component will be financed entirely by local counterpart financing. (3) Design, Construction Management and Technical Assistance. This component includes: (i) activities for design and preparation of the project; (ii) activities for construction management and quality assurance; and (iii) technical assistance (TA) and capacity building of relevant staff and the Urban Rail Company (URC). The Bank loan will support the TA and capacity building activities. (4) Safeguards and Other Construction Costs. This component will include land acquisition and resettlement costs, construction site preparation (environmental mitigation measures) as well as other project related construction costs, such as engineering insurance, work safety assurance, inspection and acceptance, and project cost estimation. This component will be financed entirely by local counterpart financing.

Original sector

FY17 - Transportation

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Road, Water Supply and Storage, Rail, Power Generation (CCGT), Commercial, Government, Automotive

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project