Zhiibaahaasing Water Storage and Distribution System Upgrades
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
The Project will upgrade the piped water distribution system and the central water storage tank in the community of Zhiibaahaasing. The scope of the Project includes the installation of a new below grade storage reservoir with high lift distribution and fire pumps that meets MECP design guidelines, as well as 200mm and 150mm drinking water transmission pipes with fire hydrants. The installation o
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Zhiibaahaasing Water Storage and Distribution System Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project will upgrade the piped water distribution system and the central water storage tank in the community of Zhiibaahaasing. The scope of the Project includes the installation of a new below grade storage reservoir with high lift distribution and fire pumps that meets MECP design guidelines, as well as 200mm and 150mm drinking water transmission pipes with fire hydrants. The installation of all transmission pipes, hydrants and water services will take place along the main road and on minor roads with existing homes in the community. The storage reservoir will be part of a site already designated for the water treatment plant. Finally, the scope will also include recapitalization of existing equipment being used in the old water treatment plant. includes sensing instruments, pumps, trim chlorination systems for distribution. The exact ratio will be determined at the final design stage. The Project aims to provide potable drinking water storage and distribution system upgrades for the community of Zhiibaahaasing so they may have safe and reliable access to clean drinking water that meets the provincial regulations. The new system will also provide fire protection which has been a problem in Zhiibaahaasing. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
