logo

Zhongshan Tanzhou Water Plant

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

In October 1992, Sino-French Holdings was awarded a 30-year concession contract with the municipal government of Zhongshan to take over and upgrade an existing water treatment plant and distribute drinking water in Tanzhou Township, Guangdong Province. The plant had a production capacity of 58,000 cubic meters per day for about 100,000 end users in Tanzhou.

To implement the contract, the Zhong

Project Information FAQ

Project Information

4 Q
The project “Zhongshan Tanzhou Water Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In October 1992, Sino-French Holdings was awarded a 30-year concession contract with the municipal government of Zhongshan to take over and upgrade an existing water treatment plant and distribute drinking water in Tanzhou Township, Guangdong Province. The plant had a production capacity of 58,000 cubic meters per day for about 100,000 end users in Tanzhou. To implement the contract, the Zhongsan Tanzhou Water Supply Company Ltd was created as the project company in which Sino-French took a 58% stake while the state-owned Zhangsan Tanzhou Economic Development Company held the remainder. Sino-French, in turn, was a 50-50 joint venture between Suez water subsidiary Ondeo and New World Infrastructure of Hong Kong. The total project cost was US$10.8 million. The project reached financial closure in May 1994 and construction completed in September 1995. The JV was financed with 40% equity investment, while the remaining 60% was paid for with a shareholder’s loan. The operations started in November 1997. http://www.nwsh.com.hk/eng/pdf/w15_zhongshan_tanzhou.pdf According to the JV, during the first half of 2000, the number of customers reached 10,326 and water consumption amounted to 6.1 million cubic meters, a 27.9% and 10.9% increase since the start of the contract, respectively. UFW was also reduced from 40% in 1992 to 13.8% in 2000. Factiva: "The 90-million-renminbi ($10.8 million) venture in Tanzhou is unique because Sino-French not only sells water to the utility, it owns half of the utility itself." According to NWH, it holds 29%, not 25% of the company, meaning that Suez also holds 29%.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data