logo

Zhongshan Tanzhou Water Plant

Active · Guangdong

Source: World Bank Group

Project
Active

In October 1992, Sino-French Holdings was awarded a 30-year concession contract with the municipal government of Zhongshan to take over and upgrade an existing water treatment plant and distribute drinking water in Tanzhou Township, Guangdong Province. The plant had a production capacity of 58,000 cubic meters per day for about 100,000 end users in Tanzhou.

To implement the contract, the Zhong

Status
Prospective
Sector
Water Supply and Storage, Government, Power Transmission, Commercial, Power Generation (CCGT), Waste Processing and Treatment
Location
Guangdong, China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Zhongshan Tanzhou Water Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Zhongshan Tanzhou Water Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Guangdong, China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In October 1992, Sino-French Holdings was awarded a 30-year concession contract with the municipal government of Zhongshan to take over and upgrade an existing water treatment plant and distribute drinking water in Tanzhou Township, Guangdong Province. The plant had a production capacity of 58,000 cubic meters per day for about 100,000 end users in Tanzhou. To implement the contract, the Zhongsan Tanzhou Water Supply Company Ltd was created as the project company in which Sino-French took a 58% stake while the state-owned Zhangsan Tanzhou Economic Development Company held the remainder. Sino-French, in turn, was a 50-50 joint venture between Suez water subsidiary Ondeo and New World Infrastructure of Hong Kong. The total project cost was US$10.8 million. The project reached financial closure in May 1994 and construction completed in September 1995. The JV was financed with 40% equity investment, while the remaining 60% was paid for with a shareholder’s loan. The operations started in November 1997. http://www.nwsh.com.hk/eng/pdf/w15_zhongshan_tanzhou.pdf According to the JV, during the first half of 2000, the number of customers reached 10,326 and water consumption amounted to 6.1 million cubic meters, a 27.9% and 10.9% increase since the start of the contract, respectively. UFW was also reduced from 40% in 1992 to 13.8% in 2000. Factiva: "The 90-million-renminbi ($10.8 million) venture in Tanzhou is unique because Sino-French not only sells water to the utility, it owns half of the utility itself." According to NWH, it holds 29%, not 25% of the company, meaning that Suez also holds 29%.

Original sector

Water and sewerage

Procurement method

Budget

Location

Country

China

State

Guangdong

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Power Transmission, Commercial, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project