Zhouhuai Road - Zhouxi Road section, part of Henan Province Zhoukou North Ring
Sector: Road • Location: Henan, China
Source: World Bank Group
The new construction of Zhoukou North Ring (Zhouhuai Road-Zhouxi Road Section) is located in Chuanhui District of Zhoukou City. The starting point is at the intersection of Wusheng Avenue and Zhouhuai Road (S206) in the town of Yunkou. The road extends 2.3 kilometers to the north and extends westward. The route has been intersected with Zhoukou Avenue, Daqing Road, Bayi Road and Zhongzhou Avenue.
- Status
- Prospective
- Sector
- Road, Government, Commercial
- Location
- Henan, China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Zhouhuai Road - Zhouxi Road section, part of Henan Province Zhoukou North Ring
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The new construction of Zhoukou North Ring (Zhouhuai Road-Zhouxi Road Section) is located in Chuanhui District of Zhoukou City. The starting point is at the intersection of Wusheng Avenue and Zhouhuai Road (S206) in the town of Yunkou. The road extends 2.3 kilometers to the north and extends westward. The route has been intersected with Zhoukou Avenue, Daqing Road, Bayi Road and Zhongzhou Avenue. The traffic is converted by setting plane crossings. The road continues to K11+862 across the Jialu River, K13+470 across the Qili River, and then the road turns to the southwest. The direction ends at the intersection of Zhouxi Road (provincial road S102) and Xinzhou Expressway connecting line, the ending station number is K14+445, and the total length of the road is 14.445km. The project is planned to be built according to the city's main road standards, two-way eight-lane design, design speed of 60km / h, road red line width of 50m. Type of concession is BOT with a contract period of 18 years. The SPV will be 80% private-owned. Financial close took place on March 13, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=c1d18573c52f4065a78daf8b3912cf7e |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | China |
State | Henan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial |
Article published date | 2024-05-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in China
- Beilungang CoalFired
- Wensu County Rural Roads Construction Project
- Huaxi section, part of the southern section of Huaguan Road
- Dongming County Highway
- Ji'an City urbanization project
- Wenzhou Oujiang Belt Expressway to Woqi Section and Oujiang Road East Extension
- Roadway No. 321 (Wuzhou Section)
- Shen-Shan Highway (Eastern Section)
