Zimbabwe - Emergency Power Infrastructure Rehabilitation Project - Phase I
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The Project complements the ongoing power sector infrastructure rehabilitation program identified by ZPC and ZETDC, subsidiaries of ZESA Holdings mandated to operate and maintain the Hwange power station and transmission & distribution networks respectively. Components included in the project were selected from a list of critical interventions that need to be conducted in the rehabilitation of pow
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Geothermal, Government
- Location
- Zimbabwe
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Zimbabwe - Emergency Power Infrastructure Rehabilitation Project - Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project complements the ongoing power sector infrastructure rehabilitation program identified by ZPC and ZETDC, subsidiaries of ZESA Holdings mandated to operate and maintain the Hwange power station and transmission & distribution networks respectively. Components included in the project were selected from a list of critical interventions that need to be conducted in the rehabilitation of power infrastructure to bring the power system to an acceptable level of performance. The supplementary financing proposal was approved on 25 July 2013 by the POC of the ZimFund, which is composed of the Zim-Fund donors and GOZ representatives, after consideration of the importance of achieving the original objectives of the Project. |
Original sector | Energy |
Budget |
Location
Country | Zimbabwe |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Zimbabwe
- Pomona Waste Management
- Zimbabwe - Urgent Water Supply and Sanitation Rehabilitation Project - Phase 2
- HARARE WATER SUPPLY
- Zimbabwe - Urgent Water Supply and Sanitation Rehabilitation Project – Consolidation Works
- HARARE SEWERAGE PROJECT
- Zimbabwe - Urgent Water Supply and Sanitation Rehabilitation Project
- Zimbabwe - Bulawayo water and sewerage services improvement project
- Zimbabwe - Emergency Power Infrastructure Rehabilitation Project - Phase II Stage II
