logo
Project

Zimbabwe - Emergency Power Infrastructure Rehabilitation Project - Phase I

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The Project complements the ongoing power sector infrastructure rehabilitation program identified by ZPC and ZETDC, subsidiaries of ZESA Holdings mandated to operate and maintain the Hwange power station and transmission & distribution networks respectively. Components included in the project were selected from a list of critical interventions that need to be conducted in the rehabilitation of pow

Sector
Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Geothermal, Government
Location
Zimbabwe
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Zimbabwe - Emergency Power Infrastructure Rehabilitation Project - Phase I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Zimbabwe - Emergency Power Infrastructure Rehabilitation Project - Phase I” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Zimbabwe. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project complements the ongoing power sector infrastructure rehabilitation program identified by ZPC and ZETDC, subsidiaries of ZESA Holdings mandated to operate and maintain the Hwange power station and transmission & distribution networks respectively. Components included in the project were selected from a list of critical interventions that need to be conducted in the rehabilitation of power infrastructure to bring the power system to an acceptable level of performance. The supplementary financing proposal was approved on 25 July 2013 by the POC of the ZimFund, which is composed of the Zim-Fund donors and GOZ representatives, after consideration of the importance of achieving the original objectives of the Project.

Original sector

Energy

Budget

Location

Country

Zimbabwe

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Geothermal, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project