Zimbabwe - Emergency Power Infrastructure Rehabilitation Project – Phase II

Sector: Water Supply and Storage • Location: Zimbabwe

Source: African Development Bank (AfDB)

The Emergency Power Infrastructure Rehabilitation Project (EPIRP) Phase II is the second energy sector project financed through the African Development Bank administered Zimbabwe Multi-Donor Trust Fund (Zim-Fund). It is part of the Government priority power systems rehabilitation investment programme under the MTP 2011-2015. Phase I of the EPIRP was designed to improve the provision of adequate an

Sector
Water Supply and Storage, Power Generation (CCGT), Hydro, Government
Location
Zimbabwe
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Zimbabwe - Emergency Power Infrastructure Rehabilitation Project – Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Zimbabwe - Emergency Power Infrastructure Rehabilitation Project – Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in Zimbabwe. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Emergency Power Infrastructure Rehabilitation Project (EPIRP) Phase II is the second energy sector project financed through the African Development Bank administered Zimbabwe Multi-Donor Trust Fund (Zim-Fund). It is part of the Government priority power systems rehabilitation investment programme under the MTP 2011-2015. Phase I of the EPIRP was designed to improve the provision of adequate and reliable electricity in an environmentally sound manner by the rehabilitation of the Ash Handling Plant at the Hwange Power Station and the power transmission and distribution facilities in the country within the initial USD 35 million budget provided by the Zim-Fund donors. Phase II is designed to further the benefit of the Phase I interventions and include aspects that are not addressed in Phase I. The total estimated project costs for Phase II is USD 32.94 million. It is to be implemented as a stand-alone project in two stages. The first stage of the Project will comprise of preparation of technical and tender document for all the works packages and implementation of activities for dedicated power supplies to water and sewerage works in Harare and the replacement of transformers at Orange Grove, Mashava, Marvel and Chertsey substations. The second stage will be the implementation of the rehabilitation works at Hwange Power station, the replacement of a transformer at Sherwood substation and the development of a power sector investment plan.

Original sector

Energy

Budget

Location

Country

Zimbabwe

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project