Zimbabwe - Emergency Power Infrastructure Rehabilitation Project – Phase II
Sector: Water Supply and Storage • Location: Zimbabwe
Source: African Development Bank (AfDB)
The Emergency Power Infrastructure Rehabilitation Project (EPIRP) Phase II is the second energy sector project financed through the African Development Bank administered Zimbabwe Multi-Donor Trust Fund (Zim-Fund). It is part of the Government priority power systems rehabilitation investment programme under the MTP 2011-2015. Phase I of the EPIRP was designed to improve the provision of adequate an
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- Zimbabwe
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Zimbabwe - Emergency Power Infrastructure Rehabilitation Project – Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Emergency Power Infrastructure Rehabilitation Project (EPIRP) Phase II is the second energy sector project financed through the African Development Bank administered Zimbabwe Multi-Donor Trust Fund (Zim-Fund). It is part of the Government priority power systems rehabilitation investment programme under the MTP 2011-2015. Phase I of the EPIRP was designed to improve the provision of adequate and reliable electricity in an environmentally sound manner by the rehabilitation of the Ash Handling Plant at the Hwange Power Station and the power transmission and distribution facilities in the country within the initial USD 35 million budget provided by the Zim-Fund donors. Phase II is designed to further the benefit of the Phase I interventions and include aspects that are not addressed in Phase I. The total estimated project costs for Phase II is USD 32.94 million. It is to be implemented as a stand-alone project in two stages. The first stage of the Project will comprise of preparation of technical and tender document for all the works packages and implementation of activities for dedicated power supplies to water and sewerage works in Harare and the replacement of transformers at Orange Grove, Mashava, Marvel and Chertsey substations. The second stage will be the implementation of the rehabilitation works at Hwange Power station, the replacement of a transformer at Sherwood substation and the development of a power sector investment plan. |
Original sector | Energy |
Budget |
Location
Country | Zimbabwe |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Zimbabwe
- Pomona Waste Management
- Zimbabwe - Urgent Water Supply and Sanitation Rehabilitation Project - Phase 2
- Zimbabwe - ZIM-FUND - Emergency Power Infrastructure Rehabilitation Project – Consolidation Works
- HARARE WATER SUPPLY
- Zimbabwe - Urgent Water Supply and Sanitation Rehabilitation Project – Consolidation Works
- HARARE SEWERAGE PROJECT
- Batoka Gorge Hydro Electric Power Scheme
- Rural Water Supply & Sanitation II