Zimbabwe - Emergency Power Infrastructure Rehabilitation Project – Phase II

Sector: Water Supply and Storage • Location: Zimbabwe

Source: African Development Bank (AfDB)

Project

The Emergency Power Infrastructure Rehabilitation Project (EPIRP) Phase II is the second energy sector project financed through the African Development Bank administered Zimbabwe Multi-Donor Trust Fund (Zim-Fund). It is part of the Government priority power systems rehabilitation investment programme under the MTP 2011-2015. Phase I of the EPIRP was designed to improve the provision of adequate an

Project Information FAQ

Project Information

4 Q
The project “Zimbabwe - Emergency Power Infrastructure Rehabilitation Project – Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in Zimbabwe. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Emergency Power Infrastructure Rehabilitation Project (EPIRP) Phase II is the second energy sector project financed through the African Development Bank administered Zimbabwe Multi-Donor Trust Fund (Zim-Fund). It is part of the Government priority power systems rehabilitation investment programme under the MTP 2011-2015. Phase I of the EPIRP was designed to improve the provision of adequate and reliable electricity in an environmentally sound manner by the rehabilitation of the Ash Handling Plant at the Hwange Power Station and the power transmission and distribution facilities in the country within the initial USD 35 million budget provided by the Zim-Fund donors. Phase II is designed to further the benefit of the Phase I interventions and include aspects that are not addressed in Phase I. The total estimated project costs for Phase II is USD 32.94 million. It is to be implemented as a stand-alone project in two stages. The first stage of the Project will comprise of preparation of technical and tender document for all the works packages and implementation of activities for dedicated power supplies to water and sewerage works in Harare and the replacement of transformers at Orange Grove, Mashava, Marvel and Chertsey substations. The second stage will be the implementation of the rehabilitation works at Hwange Power station, the replacement of a transformer at Sherwood substation and the development of a power sector investment plan.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data